No. SouthCambs/26/03192/LBC
Withdrawn
IWM Duxford South Side Royston Road Duxford Cambridgeshire
Proposal
Replacement of the critical low voltage infrastructure to the South Site and excavation and reinstatement of the required trench works across the North site to facilitate the installation of the required cables.
Key dates
- Started24 August 2026
- Consulted23 September 2026
- Decided5 November 2026