BP Chemicals Saltend Chemicals Park Saltend Lane Saltend East Riding Of Yorkshire HU12 8DS
Proposal
EIA Scoping Opinion for proposed erection of a Sustainable Aviation Fuel (SAF) production facility, including a gas fermentation facility to convert waste industrial carbon dioxide to sustainable ethanol and use of the ethanol for production of SAF, inducing an enclosed ground flare, storage tanks, installation of pipework and electrical, processing and utility equipment, administration, warehouse and laboratory buildings, new access, car parking and transport infrastructure including a truck loading area and associated works, hard and soft landscaping, areas for temporary construction laydown, and associated development following demolition of existing structures
Key dates
- Started18 August 2026
- Decided30 September 2026
Instant notifications about planning updates like this one.