No. BreconBeacons/26/25030/DNS
Undecided
Aberedw Hill 3 Km East Of Builth Wells Powys
Proposal
This must be received by PEDW by no later than 07 December 2026. Construction and operation of Aberedw Energy Park comprising up to 18 wind turbines with a maximum blade tip height of 200 metres, associated infrastructure including crane hardstandings, access tracks, borrow pits, underground electrical cabling, substations, battery energy storage, temporary construction compounds, meteorological masts and ancillary works, with an estimated generating capacity of up to 120 MW.
Key dates
- Started4 November 2026
Get the app
Instant notifications about planning updates like this one.