No. BreconBeacons/26/24736/FUL
Granted
Cefn Dryscoed Water Treatment Works Pontneddfechan SA11 5UP
Proposal
The construction of a new dissolved air floatation (DAF) building to house the installation of three new DAF tanks, DAF Motor Control Centre, flocculators and other processing and ancillary equipment, the installation of new electrical cabling, distribution boards, PLC and instrumentation, pipelines to connect the new DAF building to the existing WTW and to connect the existing raw water main to the DAF plant including associated chambers and ducts for chemical dosing, as well as a new stone wall, fencing, drainage, soft landscaping, access track and temporary enabling works.
Key dates
- Started26 June 2026
- Consulted29 July 2026
- Decided3 November 2026